Food & beverage
set the baseline a decade ago
Water Stewardship Advisory
Water stewardship advice that is built on the same hydraulic modelling, IWRM, and infrastructure planning discipline behind our municipal and utility work. The numbers behind your commitments are defensible, and the recommendations behind your targets are buildable.
set the baseline a decade ago
are the fastest-growing exposure
now expect basin-specific data, not pledges
Water stewardship is the responsible management of water, across an organization's own operations and its full value chain.
Water use, efficiency, and reduction inside the fence line
Engagement with the watershed a facility draws from and discharges into
Transparent, verifiable reporting to regulators, investors, and customers
A credible program covers all three layers above, whether reported through the Alliance for Water Stewardship (AWS) Standard, CDP Water Security, or the EU's CSRD/ESRS disclosures. Those frameworks differ in format, not in the underlying engineering and data work, which is exactly where HydraLink operates:
Water balances
Basin assessments
Demand modelling
Infrastructure constraints
How we help
Every engagement draws on the same integrated water resource management approach behind our infrastructure and operational intelligence work.
A facility- or portfolio-level assessment of water risk using basin stress data (WWF Water Risk Filter, WRI Aqueduct, CDP) layered with local infrastructure context: actual water availability, treatment capacity, and regulatory constraints at each site. Delivered as a prioritized risk map and recommendations.
A quantified accounting of a facility's or product line's water inputs, consumption, discharge, and losses, built on the same hydraulic and demand-modelling methods used for municipal water systems, producing defensible numbers for CDP disclosure, science-based targets, or an internal efficiency case. This includes Volumetric Benefit Assessment (VBA), quantifying the water benefit of a project against an established baseline so claims of water replenishment or restoration are measurable and verifiable.
Hands-on support preparing CDP Water Security questionnaires, CSRD/ESRS water and marine resources disclosures, and AWS Standard documentation. Reporting cycles repeat annually, and this is typically where a stewardship relationship becomes ongoing.
Engineering-grounded recommendations, including reuse and recycling opportunities, alternative cooling strategies, leak detection, and stormwater management, sized and scoped against real site constraints, not generic best-practice checklists. This is where strategy turns into an actual capital plan.
Advisory on collective action and basin-level engagement, helping organizations move beyond their own fence line to support the shared water resources their operations depend on. This is a requirement under AWS certification, built on the same IWRM and basin-modelling foundation behind our infrastructure planning work.
The corporate water stewardship industry has converged on frameworks like AWS and CDP to standardize how companies set and report water targets. These frameworks are valuable, but they're principle-based and largely focused on disclosure rather than basin-level outcomes. A project can be fully framework-compliant while the underlying hydrology of its catchment remains unverified.
Read the full analysis: Why Framework Compliance Isn't the Same as a Credible Water Claim Read the full analysisA water risk screening or footprint assessment typically runs 4 to 8 weeks, depending on the number of sites and how readily the underlying data is available. Disclosure support and AWS readiness work tend to follow annual or certification cycles, so those engagements are structured as ongoing retainers rather than fixed projects.
It depends on the engagement, but most projects start with site locations, water billing or metered consumption records, any existing permits or discharge data, and a point of contact who knows the facility's operations. We'll provide a specific data request list once we've scoped the engagement.
Yes. Many of our clients aren't directly regulated but are suppliers to companies that are, and need defensible water data to satisfy customer or lender requests. Getting ahead of that trickle-down pressure is often easier and cheaper than scrambling once a customer asks for it.
We build from the same hydraulic modelling, IWRM, and infrastructure planning discipline behind our municipal and utility work. That means the numbers behind your water balance, basin assessment, or VBA calculation are engineered, not estimated, and the recommendations that follow are things you can actually build and budget for.
Both. A single-site risk screening or water balance is a common and low-risk way to start. From there, many clients expand into portfolio-wide screening or ongoing disclosure support once the first engagement proves out.
Get started
Tell us about your facilities, your reporting obligations, or your basin, and we'll recommend where to start.